**posts with red text have been revised after feedback.

Friday, 10 January 2014

Re-filming and Footage Review

On Thursday 2nd January 2014 I re-filmed the performance parts of my music video. I did this as the feedback I was given in the screening stated that I needed to get rid of the garage door in the shots of Sophie. To ensure that the quality of the footage remained high I re-filmed it to avoid cropping and distorting the current images. I also filmed the extra clips that I was missing in the first edit as I had gaps in my music video. I will proceed to re-edit my music video and create a second draft.

No comments:

Post a Comment